The discovery of a woodpecker’s nest, as shown in this handout image provided by the Community Nest Finding Network, has halted construction of the Trans Mountain pipeline along a 400-metre stretch near Chilliwack, B.C. THE CANADIAN PRESS/HO-Community Nest Finding Network

VANCOUVER — The discovery of a woodpecker’s nest has halted construction of the Trans Mountain pipeline along a 400-metre stretch near Chilliwack, B.C.

A statement from Trans Mountain Corp. says buffer zones around trees and vegetation have been marked with rope signs and flagging tape near Bridal Falls where the red-breasted sapsucker has been seen nesting.

The Crown corporation says the area will not be cleared until there’s confirmation from a wildlife resource specialist that no nests are active, which would be the end of nesting season.

Sarah Ross of the Community Nest Finding Network says the group first noticed bird nests in tree cavities in early June and alerted local authorities.

She says while the red-breasted sapsucker nest is easily visible from the ground, the area also has other birds that build homes in trees during this time, with the nesting season lasting until about the end of August.

The pipeline expansion was expected to be completed this year, but that date has now been moved up to the third quarter of 2023 after the pandemic and November’s floods in B.C. forced the delays.

This report by The Canadian Press was first published June 22, 2022.

The Canadian Press

News from © The Canadian Press, 2022. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

  • 0067 PFM SaskWorks Payroll Investment Plan
    0067 PFM SaskWorks Payroll Investment Plan
  • 0066 WBPC Promo video 30 seconds
    0066 WBPC Promo video 30 seconds
  • 0065 Anova Resources field operator Oxbow
    0065 Anova Resources field operator Oxbow
  • 0064 Estevan OTS
    0064 Estevan OTS
  • 0063 Turnbull Excavating hiring crusher
    0063 Turnbull Excavating hiring crusher
  • 0062 TED_EPAC_Technology_30
    0062 TED_EPAC_Technology_30
  • 0061 SIMSA 2024 For Sask Buy Sask
    0061 SIMSA 2024 For Sask Buy Sask
  • 0060 Arizona Lithium Lease building
    0060 Arizona Lithium Lease building
  • 0059 Southeast College Heavy Equipment Operator
    0059 Southeast College Heavy Equipment Operator
  • 0058 Royal Helium Steveville opens anonymous rocket
    0058 Royal Helium Steveville opens anonymous rocket
  • 0055 Smart Power Be Smart with your Power office
    0055 Smart Power Be Smart with your Power office
  • 0053 Kingston Midstream Westspur Alameda Click Before You Dig large text
    0053 Kingston Midstream Westspur Alameda Click Before You Dig large text
  • 0052 Predator Inspections
    0052 Predator Inspections
  • 0051 JML Hiring Pumpjack assembly
    0051 JML Hiring Pumpjack assembly
  • 0049 Scotsburn Dental soft guitar
    0049 Scotsburn Dental soft guitar
  • 0046 City of Estevan This is Estevan
    0046 City of Estevan This is Estevan
  • 0041 DEEP Since 2018 now we are going to build
    0041 DEEP Since 2018 now we are going to build
  • 0032 IWS Summer hiring rock trailer music
  • 0022 Grimes winter hiring
  • 0021 OSY Rentals S8 Promo
  • 0018 IWS Hiring Royal Summer
  • 0015 Latus Viro
    0015 Latus Viro
  • 0013 Panther Drilling PO ad 03 top drive rigs
  • 0011
  • 0006 JK Junior
  • 0002 gilliss casing services
    0002 gilliss casing services
  • 9002 Pipeline Online 30 sec EBEX
    9002 Pipeline Online 30 sec EBEX
  • 9001

 

New energy and resources minister Jim Reiter says “things change,” and “governments change” when it comes to cancelled pipeline projects