Pumpjacks near a battery southwest of Torquay, Saskatchewan. Photo by Brian Zinchuk

TORONTO — The U.S. benchmark price of oil has topped US$90 per barrel for the first time since late last year.

The October futures contract for West Texas Intermediate (WTI) light sweet crude oil was up US$1.57 at US$90.09 in late-morning trading after going as high as US$90.26.

The last time the U.S. benchmark oil price topped US$90 a barrel was in November of last year.

Saudi Arabia and Russia agreed last week to extend their voluntary oil production cuts through the end of this year.

The move keeps 1.3 million barrels per day of crude oil out of the global market.

The rise in oil prices threatens to raise the price of gasoline for drivers and give a boost to inflation that central banks around the world have been working to bring under control.

This report by The Canadian Press was first published Sept. 14, 2023.

The Canadian Press

News from © The Canadian Press, 2023. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

  • 0015 Latus Viro
    0015 Latus Viro
  • 0054 SIMSA Energy Forum
    0054 SIMSA Energy Forum
  • 0053 Kingston Midstream Westspur Alameda
    0053 Kingston Midstream Westspur Alameda
  • 0052 Predator Inspections
    0052 Predator Inspections
  • 0051 JML Hiring Pumpjack assembly
    0051 JML Hiring Pumpjack assembly
  • 0049 Scotsburn Dental soft guitar
    0049 Scotsburn Dental soft guitar
  • 0046 City of Estevan This is Estevan
    0046 City of Estevan This is Estevan
  • 0043 ALX ten sizes
    0043 ALX ten sizes
  • 0039 Summit ESP Saskatchewan lower third
    0039 Summit ESP Saskatchewan lower third
  • 0041 DEEP Since 2018 now we are going to build
    0041 DEEP Since 2018 now we are going to build
  • 0032 IWS Summer hiring rock trailer music
  • 0022 Grimes winter hiring
  • 0021 OSY Rentals S8 Promo
  • 0018 IWS Hiring Royal Summer
  • 0013 Panther Drilling PO ad 03 top drive rigs
  • 0011
  • 0006 JK Junior
  • 0004 Royal Helium PO Ad 02
  • 9001
  • 0002

 

PTRC receives carbon capture award for SaskPower’s Aquistore project near Estevan

Trans Mountain says ‘worst-case’ could see pipeline completion delayed to end of 2024