The ‘Hoegh Esperanza’ Floating Storage and Regasification Unit (FSRU) is anchored during the opening of the LNG (Liquefied Natural Gas) terminal in Wilhelmshaven, Germany, Saturday, Dec. 17, 2022. (AP Photo/Michael Sohn, pool)

By Geir Moulson in Berlin

BERLIN (AP) — Chancellor Olaf Scholz on Saturday inaugurated Germany’s first liquefied natural gas terminal, declaring that the speed with which it was put into service is a signal that Europe’s biggest economy will remain strong.

The top three officials in the government — Scholz, Economy Minister Robert Habeck and Finance Minister Christian Lindner — attended the inauguration in the North Sea port of Wilhelmshaven in a sign of the importance that Germany attaches to several new LNG terminals that it is scrambling to build following Russia’s invasion of Ukraine.

The terminals are part of a drive to prevent an energy crunch that also includes temporarily reactivating old oil– and coal-fired power stations and extending the life of Germany’s last three nuclear power plants, which were supposed to be switched off at the end of this year, until mid-April.

Scholz announced days after Russia invaded Ukraine in February that the government had decided to build the first two LNG terminals quickly.

“When we said that, for example, such a terminal should be built here in Wilhelmshaven this year already, many said that’s never possible, that would never succeed,” the chancellor said at Saturday’s ceremony. “And the opposite is true.”

Port facilities were completed a month ago and a specially equipped ship, a so-called “floating storage and regasification unit,” docked on Thursday with 165,000 cubic meters of LNG. The Economy Ministry said that regasification is expected to start in the coming days and “regular service” in January.

Two more terminals are slated to open this winter, with another three expected to be available next winter. Scholz said their total capacity will be well over half the amount of Russian pipeline gas that was supplied last winter.

Sluggish planning processes have long been a concern in Germany. Scholz proclaimed on Saturday that “this is now the new German speed with which we are moving infrastructure forward.”

“This is a good day for our country and a good signal to the whole world that the German economy will be in a position to continue being strong, to produce and to deal with this challenge,” he said.

Efforts to make Germany independent of Russian gas were well underway before Russia started reducing supplies through the Nord Stream 1 pipeline, which was its main supply route, in mid-June. Russia, which used to account for more than half of the country’s natural gas supply, hasn’t delivered any gas to Germany since the end of August.

Scholz underlined the importance of pursuing Germany’s transition to renewable energy sources, and stressed that a new pipeline to Wilhelmshaven was planned in such a way that it can in the future be adapted to transport hydrogen.

Still, the new gas terminals have drawn criticism from environmental groups.

And while they have broad mainstream political support, a leader of the far-right Alternative for Germany party, Tino Chrupalla, argued on Saturday that the Wilhelmshaven facility wouldn’t solve the energy crisis and called for the government to drop sanctions against Russia.

News from © The Canadian Press, 2022. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

  • 0067 PFM SaskWorks Payroll Investment Plan
    0067 PFM SaskWorks Payroll Investment Plan
  • 0066 WBPC Promo video 30 seconds
    0066 WBPC Promo video 30 seconds
  • 0065 Anova Resources field operator Oxbow
    0065 Anova Resources field operator Oxbow
  • 0064 Estevan OTS
    0064 Estevan OTS
  • 0063 Turnbull Excavating hiring crusher
    0063 Turnbull Excavating hiring crusher
  • 0062 TED_EPAC_Technology_30
    0062 TED_EPAC_Technology_30
  • 0061 SIMSA 2024 For Sask Buy Sask
    0061 SIMSA 2024 For Sask Buy Sask
  • 0060 Arizona Lithium Lease building
    0060 Arizona Lithium Lease building
  • 0059 Southeast College Heavy Equipment Operator
    0059 Southeast College Heavy Equipment Operator
  • 0058 Royal Helium Steveville opens anonymous rocket
    0058 Royal Helium Steveville opens anonymous rocket
  • 0055 Smart Power Be Smart with your Power office
    0055 Smart Power Be Smart with your Power office
  • 0053 Kingston Midstream Westspur Alameda Click Before You Dig large text
    0053 Kingston Midstream Westspur Alameda Click Before You Dig large text
  • 0052 Predator Inspections
    0052 Predator Inspections
  • 0051 JML Hiring Pumpjack assembly
    0051 JML Hiring Pumpjack assembly
  • 0049 Scotsburn Dental soft guitar
    0049 Scotsburn Dental soft guitar
  • 0046 City of Estevan This is Estevan
    0046 City of Estevan This is Estevan
  • 0041 DEEP Since 2018 now we are going to build
    0041 DEEP Since 2018 now we are going to build
  • 0032 IWS Summer hiring rock trailer music
  • 0022 Grimes winter hiring
  • 0021 OSY Rentals S8 Promo
  • 0018 IWS Hiring Royal Summer
  • 0015 Latus Viro
    0015 Latus Viro
  • 0013 Panther Drilling PO ad 03 top drive rigs
  • 0011
  • 0006 JK Junior
  • 0002 gilliss casing services
    0002 gilliss casing services
  • 9002 Pipeline Online 30 sec EBEX
    9002 Pipeline Online 30 sec EBEX
  • 9001

 

Brian Crossman: How the Grinch tried to steal the oilpatch