Dakota Access Pipeline. Energy Transfer LP/Youtube screen capture

BISMARCK, N.D. (AP) — The U.S. Supreme Court on Tuesday refused to consider an appeal of a lawsuit over the Dakota Access Pipeline, meaning that an ongoing environmental review of the pipeline will continue.

Dakota Access, which is controlled by Texas-based Energy Transfer, appealed a lower court ruling that affirmed the need for a more thorough environmental study by the U.S. Army Corps of Engineers, the Bismarck Tribune reported.

The Corps issued an easement for the pipeline’s Missouri River crossing in 2017, but a federal judge concluded in 2020 that a prior environmental analysis of the line was inadequate and revoked the permit. The outcome of the new environmental review, which the agency began in September 2020, will determine whether the Corps reissues the permit.

The Standing Rock Sioux Tribe is concerned that the pipeline could break and that an oil spill could ruin its water supply. The line passes under the Missouri River upstream from its reservation. The tribe first sued over the pipeline five years ago.

Energy Transfer and the Corps maintain the line is safe.

The Supreme Court justices did not offer any rationale Tuesday on why they declined to take the case. The court typically selects about 100 cases a year out of thousands of requests.

The pipeline has operated since 2017 and was the target of large protests in south-central North Dakota during construction.

The Associated Press

News from © The Canadian Press, 2022. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

  • 0067 PFM SaskWorks Payroll Investment Plan
    0067 PFM SaskWorks Payroll Investment Plan
  • 0066 WBPC Promo video 30 seconds
    0066 WBPC Promo video 30 seconds
  • 0065 Anova Resources field operator Oxbow
    0065 Anova Resources field operator Oxbow
  • 0064 Estevan OTS
    0064 Estevan OTS
  • 0063 Turnbull Excavating hiring crusher
    0063 Turnbull Excavating hiring crusher
  • 0062 TED_EPAC_Technology_30
    0062 TED_EPAC_Technology_30
  • 0061 SIMSA 2024 For Sask Buy Sask
    0061 SIMSA 2024 For Sask Buy Sask
  • 0060 Arizona Lithium Lease building
    0060 Arizona Lithium Lease building
  • 0059 Southeast College Heavy Equipment Operator
    0059 Southeast College Heavy Equipment Operator
  • 0058 Royal Helium Steveville opens anonymous rocket
    0058 Royal Helium Steveville opens anonymous rocket
  • 0055 Smart Power Be Smart with your Power office
    0055 Smart Power Be Smart with your Power office
  • 0053 Kingston Midstream Westspur Alameda Click Before You Dig large text
    0053 Kingston Midstream Westspur Alameda Click Before You Dig large text
  • 0052 Predator Inspections
    0052 Predator Inspections
  • 0051 JML Hiring Pumpjack assembly
    0051 JML Hiring Pumpjack assembly
  • 0049 Scotsburn Dental soft guitar
    0049 Scotsburn Dental soft guitar
  • 0046 City of Estevan This is Estevan
    0046 City of Estevan This is Estevan
  • 0041 DEEP Since 2018 now we are going to build
    0041 DEEP Since 2018 now we are going to build
  • 0032 IWS Summer hiring rock trailer music
  • 0022 Grimes winter hiring
  • 0021 OSY Rentals S8 Promo
  • 0018 IWS Hiring Royal Summer
  • 0015 Latus Viro
    0015 Latus Viro
  • 0013 Panther Drilling PO ad 03 top drive rigs
  • 0011
  • 0006 JK Junior
  • 0002 gilliss casing services
    0002 gilliss casing services
  • 9002 Pipeline Online 30 sec EBEX
    9002 Pipeline Online 30 sec EBEX
  • 9001