CALGARY — The chief executive of Suncor Energy Inc. says the company must do more to improve workplace safety after a truck crash earlier this month resulted in the death of a contractor at the company’s Base Mine site near Fort McMurray, Alta.

Mark Little, CEO of the Calgary−based company, called the fatality — along with two other operational incidents in December that negatively affected Suncor’s production volumes — “unacceptable.”

“I am deeply disappointed by these events and I am committed to implementing corrective actions, continuing to strengthen our processes and accountability, and to improving Suncor’s performance,” Little said in a news release.

Suncor released more details Tuesday about the workplace death, which occurred on Jan. 6 and was publicly disclosed by the company that day.

The company says one heavy haul truck rear−ended a second heavy haul truck while they were both driving up a mine haul ramp.

The two workers in the truck that was hit from behind sustained minor injuries while the driver of the other truck died. The worker who died was a contract worker employed by North American Construction Group Ltd.

Also on Tuesday, Suncor reported two other operational incidents that it says resulted in a production loss of about 195,000 barrels per day in the last half of December.

One of the incidents involved equipment failure at the Syncrude Mildred Lake mine site. The necessary repair work took three weeks instead of an estimated one week because of extreme cold weather, the company says.

The second incident involved furnace failures at the company’s Firebag in situ operation, which resulted in the temporary shutdown of approximately 170 wells. Suncor attributed this incident to extreme cold as well, and said Tuesday it is now conducting an investigation to ensure its winterization program is “sufficiently robust to withstand extended periods of cold weather.”

Both the Syncrude and Firebag assets have since returned to normal production levels, Suncor said. But due to reduced production during the last half of December, the company’s 2021 annual production was 732,000 barrels per day, or approximately 1 per cent below its guidance range of 740,000 barrels per day.

This report by The Canadian Press was first published Jan. 18, 2022.

Companies in this story: (TSX:SU)

Amanda Stephenson, The Canadian Press

News from © The Canadian Press, 2021. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

  • 0072 Outlaw Buckers and Oil Kings 2024
    0072 Outlaw Buckers and Oil Kings 2024
  • 0069 Sask Oil Show 2024 banquet tickets
    0069 Sask Oil Show 2024 banquet tickets
  • 0071 Pride Upkeep 2024 Packages
    0071 Pride Upkeep 2024 Packages
  • 0070 Sask Oil Show 2024 pre-register
    0070 Sask Oil Show 2024 pre-register
  • 0068 Sask Oil Show 2024 booth
    0068 Sask Oil Show 2024 booth
  • 0067 PFM SaskWorks Payroll Investment Plan
    0067 PFM SaskWorks Payroll Investment Plan
  • 0066 WBPC Promo video 30 seconds
    0066 WBPC Promo video 30 seconds
  • 0065 Anova Resources field operator Oxbow
    0065 Anova Resources field operator Oxbow
  • 0064 Estevan OTS
    0064 Estevan OTS
  • 0063 Turnbull Excavating hiring crusher
    0063 Turnbull Excavating hiring crusher
  • 0062 TED_EPAC_Technology_30
    0062 TED_EPAC_Technology_30
  • 0061 SIMSA 2024 For Sask Buy Sask
    0061 SIMSA 2024 For Sask Buy Sask
  • 0060 Arizona Lithium Lease building
    0060 Arizona Lithium Lease building
  • 0059 Southeast College Heavy Equipment Operator
    0059 Southeast College Heavy Equipment Operator
  • 0058 Royal Helium Steveville opens anonymous rocket
    0058 Royal Helium Steveville opens anonymous rocket
  • 0055 Smart Power Be Smart with your Power office
    0055 Smart Power Be Smart with your Power office
  • 0053 Kingston Midstream Westspur Alameda Click Before You Dig large text
    0053 Kingston Midstream Westspur Alameda Click Before You Dig large text
  • 0052 Predator Inspections
    0052 Predator Inspections
  • 0051 JML Hiring Pumpjack assembly
    0051 JML Hiring Pumpjack assembly
  • 0049 Scotsburn Dental soft guitar
    0049 Scotsburn Dental soft guitar
  • 0046 City of Estevan This is Estevan
    0046 City of Estevan This is Estevan
  • 0041 DEEP Since 2018 now we are going to build
    0041 DEEP Since 2018 now we are going to build
  • 0032 IWS Summer hiring rock trailer music
  • 0022 Grimes winter hiring
  • 0021 OSY Rentals S8 Promo
  • 0018 IWS Hiring Royal Summer
  • 0015 Latus Viro
    0015 Latus Viro
  • 0013 Panther Drilling PO ad 03 top drive rigs
  • 0011
  • 0006 JK Junior
  • 0002 gilliss casing services
    0002 gilliss casing services
  • 9002 Pipeline Online 30 sec EBEX
    9002 Pipeline Online 30 sec EBEX
  • 9001