Lisa Drake, centre, vice-president of EV Industrialization for Ford Model e, speaks with Quebec Premier François Legault, left, and Minister of Innovation, Science and Industry François-Philippe Champagne following a press conference to announce the construction of a new Ford manufacturing plant in Becancour, Que., Thursday, Aug.17, 2023. THE CANADIAN PRESS/Christinne Muschi

Ford Motor Co. and its South Korean partners said Thursday they’re building a $1.2 billion manufacturing plant for electric vehicle battery material in Quebec with the help of government funding.

The Quebec and federal governments are covering about half the cost, each putting up $322 million for the project they say is good for the environment and the economy.

Ford said the 280,000-square-metre site in Bécancour, Que. is the company’s first investment in the province and that it will help build the regional electric vehicle ecosystem.

“We’re excited to invest in this new facility to create a vertically integrated, closed-loop battery manufacturing supply chain in North America,” said Ford of Canada chief executive Bev Goodman.

Ford says the cathode materials facility, located on the south shore of the St. Lawrence River halfway between Montreal and Quebec City, will create 345 jobs once it’s operational in 2026.

Industry Minister François-Philippe Champagne, who has been aggressively courting electric vehicle-related investments in Canada, said the investment will help maintain well-paying jobs for years to come.

“This investment shows once again that Canada is the green strategic partner of choice for global leaders in the automotive industry.”

At a press conference, Quebec Premier François Legault praised the announcement as evidence of the province’s growing leadership in the green economy.

Canada has seen a wave of investments in the electric vehicle transition as governments boost incentives and compete for investments.

Ford committed $1.8 billion in 2020 to transition their Oakville, Ont. plant to produce electric vehicles, while overall electric vehicle-related commitments across Canada in the past three years have topped $25 billion, according to Unifor.

Government support for battery plants, including from Volkswagen and Stellantis, have drawn scrutiny and criticism because of the size of the subsidies that are expected to run north of $10 billion each as Canada tries to match the generous incentives being offered in the U.S.

Battery plant subsidies are tied to how much the factories produce and wind down over time, as governments look to incentivize the huge and rapid buildup in capacity needed to transition to an electric-based automotive sector.

Funding for the Ford plant in Quebec will come from the federal government’s Strategic Innovation Fund, while the Quebec portion is coming from a partially forgivable loan through Investissement Québec.

This report by The Canadian Press was first published Aug. 17, 2023.

News from © The Canadian Press, 2023. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

  • 0084 EMP Metals Pipeline Online
    0084 EMP Metals Pipeline Online
  • 0053 Kingston Midstream Westspur Alameda Click
    0053 Kingston Midstream Westspur Alameda Click
  • 0082 CsHM 2024 Pipeline
    0082 CsHM 2024 Pipeline
  • 0077 Caprice Resources Stand Up For Free Speech
    0077 Caprice Resources Stand Up For Free Speech
  • 0076 Latus only
    0076 Latus only
  • 0061 SIMSA 2024 For Sask Buy Sask
    0061 SIMSA 2024 For Sask Buy Sask
  • 0055 Smart Power Be Smart with your Power office
    0055 Smart Power Be Smart with your Power office
  • 0051 JML Hiring Pumpjack assembly
    0051 JML Hiring Pumpjack assembly
  • 0049 Scotsburn Dental soft guitar
    0049 Scotsburn Dental soft guitar
  • 0046 City of Estevan This is Estevan
    0046 City of Estevan This is Estevan
  • 0041 DEEP Since 2018 now we are going to build
    0041 DEEP Since 2018 now we are going to build
  • 0032 IWS Summer hiring rock trailer music
  • 0022 Grimes winter hiring
  • 0021 OSY Rentals S8 Promo
  • 0018 IWS Hiring Royal Summer
  • 0013 Panther Drilling PO ad 03 top drive rigs
  • 0011
  • 0006 JK Junior
  • 0002 gilliss casing services
    0002 gilliss casing services
  • 9002 Pipeline Online 30 sec EBEX
    9002 Pipeline Online 30 sec EBEX
  • 9001

 

Are the federal Clean Electricity Standards impossible to meet? We asked SaskPower