Assembly of a wind turbine near Assiniboia, Sask., on Jan. 7, 2021. Photo by Brian Zinchuk

Wind power generation in Alberta has flatlined twice in as many days, and as weather patterns typically flow from west to east, Saskatchewan has seen similar conditions.

On Sunday, Feb. 4, Alberta saw wind power generation fall to 15 megawatts during the supper hour. On Feb. 5, wind fell to less than 1 per cent output before noon and remained at that level (and much lower) for almost all of the next 24 hours.

So what happened in Saskatchewan? Pipeline Online asked SaskPower, and got this response on Feb. 6 from spokesperson Joel Cherry by email. In situations like this, Pipeline Online usually asks how long the province’s 617 megawatts of grid-scale wind produces zero power, and how long it produces less than 10 megawatts (1.6 per cent), which is effectively zero.

Cherry said, “On Feb 4 we had about an hour of less than 10 megawatts of wind from 12 a.m. to 1 a.m.

“Yesterday (Feb. 5) we had less than 10 megawatts from 1:30 p.m. to 6:45 p.m., from 8:15 p.m. to 9 p.m. and then from 9:45 to midnight. We were at zero for much of the afternoon and then from 10:45 to midnight. We did have wind production in the 100-150 MW range throughout much of the morning up to 10 a.m. before winds died off for the day.”

  • 0073 SaskWorks-Pipeline Online
    0073 SaskWorks-Pipeline Online
  • 0072 Outlaw Buckers and Oil Kings 2024
    0072 Outlaw Buckers and Oil Kings 2024
  • 0069 Sask Oil Show 2024 banquet tickets
    0069 Sask Oil Show 2024 banquet tickets
  • 0071 Pride Upkeep 2024 Packages
    0071 Pride Upkeep 2024 Packages
  • 0070 Sask Oil Show 2024 pre-register
    0070 Sask Oil Show 2024 pre-register
  • 0068 Sask Oil Show 2024 booth
    0068 Sask Oil Show 2024 booth
  • 0067 PFM SaskWorks Payroll Investment Plan
    0067 PFM SaskWorks Payroll Investment Plan
  • 0066 WBPC Promo video 30 seconds
    0066 WBPC Promo video 30 seconds
  • 0064 Estevan OTS
    0064 Estevan OTS
  • 0063 Turnbull Excavating hiring crusher
    0063 Turnbull Excavating hiring crusher
  • 0062 TED_EPAC_Technology_30
    0062 TED_EPAC_Technology_30
  • 0061 SIMSA 2024 For Sask Buy Sask
    0061 SIMSA 2024 For Sask Buy Sask
  • 0058 Royal Helium Steveville opens anonymous rocket
    0058 Royal Helium Steveville opens anonymous rocket
  • 0055 Smart Power Be Smart with your Power office
    0055 Smart Power Be Smart with your Power office
  • 0052 Predator Inspections
    0052 Predator Inspections
  • 0051 JML Hiring Pumpjack assembly
    0051 JML Hiring Pumpjack assembly
  • 0049 Scotsburn Dental soft guitar
    0049 Scotsburn Dental soft guitar
  • 0046 City of Estevan This is Estevan
    0046 City of Estevan This is Estevan
  • 0041 DEEP Since 2018 now we are going to build
    0041 DEEP Since 2018 now we are going to build
  • 0032 IWS Summer hiring rock trailer music
  • 0022 Grimes winter hiring
  • 0021 OSY Rentals S8 Promo
  • 0018 IWS Hiring Royal Summer
  • 0015 Latus Viro
    0015 Latus Viro
  • 0013 Panther Drilling PO ad 03 top drive rigs
  • 0011
  • 0006 JK Junior
  • 0002 gilliss casing services
    0002 gilliss casing services
  • 9002 Pipeline Online 30 sec EBEX
    9002 Pipeline Online 30 sec EBEX
  • 9001

 

Alberta’s flatlined wind power production meant the province was importing power from its neighbours, a frequent occurrence of back-and-forth trade. The intertie between the two provinces had been downrated several months ago to 90 megawatts until some maintenance was completed. During the mid-January electrical crisis in Alberta, the capacity of the line was temporarily pushed back to 153 megawatts to help Alberta get through its critical shortage, before returning back to 90 megawatts.

Those repairs are now done, Cherry said. “We did start exporting full tie of 153 once the tie-line with Alberta was back to full capacity, which occurred yesterday. It was not an emergency exception.”

As part of those regular electrical market exchanges, SaskPower also imported power from Manitoba Hydro. Cherry said, “We imported between 290 megawatts and 148 megawatts from Manitoba during that time period, with our total net imports ranging from 132 megawatts at 7:45 p.m. to four megawatts at midnight.”

On Feb. 4, Saskatchewan’s 30 megawatts of grid-scale solar showed negligible power generation. So on that day, not only were periods of next to no wind power, but also no solar, at the same time.

Part of a 2014  equivalency agreement with the then-Conservative federal government allowed SaskPower to extend the life of its coal-fired power generation assets a few more years. In return, the province committed to expanding wind and solar power generation by an additional 3,000 megawatts by 2035. Currently a 200 megawatt wind project called the Bekevar Yōtin Wind Facility is under construction at Kipling, and a 100 megawatt solar project was recently announced for Estevan. Both are being built by independent power producers who will sell their power to SaskPower.

On Sept. 25, 2023, SaskPower president and CEO Rupen Pandya told Pipeline Online, “When we signed the equivalency agreement with the federal government in 2014 to allow us to keep using coal to the end of 2030, part of that agreement required us to build out renewables in the province, so that we could operate coal assets, coal generators, past their end of life. And that’s what we’ve been able to do. And we continue to do. So, part of the build out of renewables that’s required as part of the equivalency agreement, that 3,000 megawatts that we need to put in place by 2035. I think 2,000 by 2030.”

The proposed federal Clean Electricity Regulations intend to phase out unabated coal and natural gas power generation in Canada by 2035. In Saskatchewan on Feb. 4, natural gas and coal accounted for 88 per cent of power generation, combined. In Alberta, Tuesday morning, it was 96 per cent (mostly natural gas, with some coal)

 

  • 0073 SaskWorks-Pipeline Online
    0073 SaskWorks-Pipeline Online
  • 0072 Outlaw Buckers and Oil Kings 2024
    0072 Outlaw Buckers and Oil Kings 2024
  • 0069 Sask Oil Show 2024 banquet tickets
    0069 Sask Oil Show 2024 banquet tickets
  • 0071 Pride Upkeep 2024 Packages
    0071 Pride Upkeep 2024 Packages
  • 0070 Sask Oil Show 2024 pre-register
    0070 Sask Oil Show 2024 pre-register
  • 0068 Sask Oil Show 2024 booth
    0068 Sask Oil Show 2024 booth
  • 0067 PFM SaskWorks Payroll Investment Plan
    0067 PFM SaskWorks Payroll Investment Plan
  • 0066 WBPC Promo video 30 seconds
    0066 WBPC Promo video 30 seconds
  • 0064 Estevan OTS
    0064 Estevan OTS
  • 0063 Turnbull Excavating hiring crusher
    0063 Turnbull Excavating hiring crusher
  • 0062 TED_EPAC_Technology_30
    0062 TED_EPAC_Technology_30
  • 0061 SIMSA 2024 For Sask Buy Sask
    0061 SIMSA 2024 For Sask Buy Sask
  • 0058 Royal Helium Steveville opens anonymous rocket
    0058 Royal Helium Steveville opens anonymous rocket
  • 0055 Smart Power Be Smart with your Power office
    0055 Smart Power Be Smart with your Power office
  • 0052 Predator Inspections
    0052 Predator Inspections
  • 0051 JML Hiring Pumpjack assembly
    0051 JML Hiring Pumpjack assembly
  • 0049 Scotsburn Dental soft guitar
    0049 Scotsburn Dental soft guitar
  • 0046 City of Estevan This is Estevan
    0046 City of Estevan This is Estevan
  • 0041 DEEP Since 2018 now we are going to build
    0041 DEEP Since 2018 now we are going to build
  • 0032 IWS Summer hiring rock trailer music
  • 0022 Grimes winter hiring
  • 0021 OSY Rentals S8 Promo
  • 0018 IWS Hiring Royal Summer
  • 0015 Latus Viro
    0015 Latus Viro
  • 0013 Panther Drilling PO ad 03 top drive rigs
  • 0011
  • 0006 JK Junior
  • 0002 gilliss casing services
    0002 gilliss casing services
  • 9002 Pipeline Online 30 sec EBEX
    9002 Pipeline Online 30 sec EBEX
  • 9001

 

Part 2: Converting the carbon capture plant from coal to natural gas could reduce emissions, but lead to the end of coal at Estevan

Kipling area Bekevar Yōtin Wind Facility turns sod, gets $50 million from feds, money that came from Saskatchewan businesses via output based pricing

SaskPower chooses developer for Estevan-area 100 megawatt solar project