Minister of Environment and Climate Change Steven Guilbeault rises during Question Period, Thursday, Feb. 16, 2023 in Ottawa. Guilbeault says Alberta’s nine-month silence over two releases of toxic oilsands tailings water is worrisome. THE CANADIAN PRESS/Adrian Wyld

Alberta’s nine-month silence over two releases of toxic oilsands tailings water is “worrisome,” said federal Environment Minister Steven Guilbeault.

“It is very worrisome that for over half a year, the Alberta regulator did not communicate with (Environment Canada), nor did they communicate with the Indigenous nations,” Guilbeault said Thursday in Ottawa.

Alberta has an agreement with Ottawa that all such events must be reported promptly to the federal department, which has enforcement responsibilities over water.

“We have to be notified within 24 hours,” Guilbeault said.

He said Ottawa can’t fulfil its duties around environmental enforcement if provinces keep it in the dark about problems.

Imperial Oil reported brown sludge outside one of its tailings ponds at its Kearl mine about 70 kilometres north of Fort McMurray, Alta., last May. Over the summer, the sludge was found to be tailings seeping from the pond containing high levels of toxins such as arsenic.

Neither local First Nations, the federal government, nor other jurisdictions that share the watershed such as the Northwest Territories were informed of the seepage or kept updated. It wasn’t until Feb. 7 that the Alberta Energy Regulator publicly released an environmental protection order — after another 5.3 million litres of tailings at Kearl escaped from a catchment pond.

In Alberta, such incidents are normally reported first to the Environmental, Dangerous Goods and Emergencies call centre, operated by Alberta Transportation, a government ministry. Reports involving the oilpatch are then passed to the regulator.

“Alberta EDGE manages all (Transport of Dangerous Goods) emergency calls and assesses the severity of dangerous goods incidents,” says the department’s website. “(It) communicates openly with other regulatory agencies, such as the Alberta Energy Regulator (AER), in the event of an emergency or safety-related incident.”

The regulator operates as a corporation at arms length from the province, but its budget must be approved by Alberta’s energy minister and its policy direction is set by government.

Alberta Premier Danielle Smith has blamed Imperial for the slow communications around the releases and demanded what she called “radical transparency” from energy companies.

But the Athabasca Chipewyan First Nation and Mikisew Cree First Nation have both criticized the United Conservative government’s silence on the spill, saying their people harvested on lands near the spill for months without knowing of the potential hazards.

The Northwest Territories has said Alberta violated the terms of their bilateral agreement, which obliges either party to let the other know about anything affecting water quality.

Smith has said water quality was unaffected, so the agreement didn’t come into play.

Guilbeault said the case points to the need for a better system of monitoring and reporting.

“When I say we need to find better mechanisms, that’s what I’m talking about,” he said.

Environment Canada is investigating the spill and seepage, which still continues.

This report by The Canadian Press was first published March 9, 2023.

Bob Weber, The Canadian Press


News from © The Canadian Press, 2022. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

  • 0079 Ministry of Energy Business_incentive PO
    0079 Ministry of Energy Business_incentive PO
  • 0078 LHOS 2024
    0078 LHOS 2024
  • 0077 Caprice Resources Stand Up For Free Speech
    0077 Caprice Resources Stand Up For Free Speech
  • 0053 Kingston Midstream Westspur Alameda
    0053 Kingston Midstream Westspur Alameda
  • 0076 Latus only
    0076 Latus only
  • 0073 SaskWorks-Pipeline Online
    0073 SaskWorks-Pipeline Online
  • 0063 Turnbull Excavating hiring crusher
    0063 Turnbull Excavating hiring crusher
  • 0061 SIMSA 2024 For Sask Buy Sask
    0061 SIMSA 2024 For Sask Buy Sask
  • 0058 Royal Helium Steveville opens anonymous rocket
    0058 Royal Helium Steveville opens anonymous rocket
  • 0055 Smart Power Be Smart with your Power office
    0055 Smart Power Be Smart with your Power office
  • 0051 JML Hiring Pumpjack assembly
    0051 JML Hiring Pumpjack assembly
  • 0049 Scotsburn Dental soft guitar
    0049 Scotsburn Dental soft guitar
  • 0046 City of Estevan This is Estevan
    0046 City of Estevan This is Estevan
  • 0041 DEEP Since 2018 now we are going to build
    0041 DEEP Since 2018 now we are going to build
  • 0032 IWS Summer hiring rock trailer music
  • 0022 Grimes winter hiring
  • 0021 OSY Rentals S8 Promo
  • 0018 IWS Hiring Royal Summer
  • 0013 Panther Drilling PO ad 03 top drive rigs
  • 0011
  • 0006 JK Junior
  • 0002 gilliss casing services
    0002 gilliss casing services
  • 9002 Pipeline Online 30 sec EBEX
    9002 Pipeline Online 30 sec EBEX
  • 9001

 

Vermilion sells 5,500 boepd in southeast Saskatchewan around Arcola and Queensdale in $225 million deal