Wind turbine at Grenfell. Photo by Brian Zinchuk

According to SaskPower’s Where Your Power Comes From webpage, wind power generation in Saskatchewan averaged 31 megawatts on Friday, April 14. As it’s a daily average, that means at times wind generation was below 31 megawatts.

That means out of the 617 megawatts of installed grid generation in Saskatchewan, wind generation averaged five per cent output. Again, as that was an average, it means there were times during the day it was higher and lower than five per cent.

This is a repeat of a pattern that has shown itself several times over the last 16 months. When wind power generation craters in Alberta, typically a similar thing happens here the following day. And on Thursday, April 13, Alberta saw low wind production for most of the day according to the Alberta Electric System Operator. At 10:25 a.m., it had fallen as low as six megawatts, out of 3,618 megawatts of nameplate generation capacity. That was 0.14 per cent of capacity.

SaskPower is intent on building an additional 3,000 megawatts of wind and solar generation. There are currently 617 megawatts of grid-scale wind and 30 megawatts of grid-scale solar.

 

  • 0079 Ministry of Energy Business_incentive PO
    0079 Ministry of Energy Business_incentive PO
  • 0078 LHOS 2024
    0078 LHOS 2024
  • 0077 Caprice Resources Stand Up For Free Speech
    0077 Caprice Resources Stand Up For Free Speech
  • 0053 Kingston Midstream Westspur Alameda
    0053 Kingston Midstream Westspur Alameda
  • 0076 Latus only
    0076 Latus only
  • 0073 SaskWorks-Pipeline Online
    0073 SaskWorks-Pipeline Online
  • 0063 Turnbull Excavating hiring crusher
    0063 Turnbull Excavating hiring crusher
  • 0061 SIMSA 2024 For Sask Buy Sask
    0061 SIMSA 2024 For Sask Buy Sask
  • 0058 Royal Helium Steveville opens anonymous rocket
    0058 Royal Helium Steveville opens anonymous rocket
  • 0055 Smart Power Be Smart with your Power office
    0055 Smart Power Be Smart with your Power office
  • 0051 JML Hiring Pumpjack assembly
    0051 JML Hiring Pumpjack assembly
  • 0049 Scotsburn Dental soft guitar
    0049 Scotsburn Dental soft guitar
  • 0046 City of Estevan This is Estevan
    0046 City of Estevan This is Estevan
  • 0041 DEEP Since 2018 now we are going to build
    0041 DEEP Since 2018 now we are going to build
  • 0032 IWS Summer hiring rock trailer music
  • 0022 Grimes winter hiring
  • 0021 OSY Rentals S8 Promo
  • 0018 IWS Hiring Royal Summer
  • 0013 Panther Drilling PO ad 03 top drive rigs
  • 0011
  • 0006 JK Junior
  • 0002 gilliss casing services
    0002 gilliss casing services
  • 9002 Pipeline Online 30 sec EBEX
    9002 Pipeline Online 30 sec EBEX
  • 9001

 

 

What do you get when you divide 6 by 3,618? The fraction of power output of Alberta wind on Thursday morning

As Alberta’s wind power generation collapsed this week, so, too did Saskatchewan’s