Brian Zinchuk is editor and owner of Pipeline Online

Wind turbines on the Alberta side of the Saskatchewan/Alberta border, northwest of Macklin, Saskatchewan Photo by Brian Zinchuk
If you just had your morning coffee in Alberta, it’s unlikely your coffee pot was powered by wind.
That’s because at 10:16 a.m. on Wednesday, July 27, Alberta’s fleet of 26 wind farms, supposedly capable of producing 2,269 megawatts, was producing just 22 megawatts, slightly less than one per cent of nameplate capacity.
Solar at the same time was putting out 38.2 per cent of its capacity, two hours before noon.

Alberta’s province’s power grid contributions at 10:16 a.m. on Wednesday, July 27. “MC” is maximum capacity in megawatts, “TNG” means total net to grid, and “DCR” is dispatched and accepted contingency reserve. Alberta Electric System Operator
Just three of those 26 wind farms spread across southern Alberta were contributing any power at all to the grid, as seen below

Alberta’s wind power generation at 10:16 a.m. on Wednesday, July 27 showed just three of 26 wind farms contributing anything at all to the province’s power grid. Alberta Electric System Operator
While Alberta has 50 megawatts of battery storage capacity across three battery facilities, yet again, the total net to grid at that moment was zero megawatts. In seven months of periodic reporting on Alberta’s power grid, Pipeline Online has not yet seen any power contributed to the grid from battery storage, despite incidents like this when power generation from wind or solar was flatlined.
- 0135 SASPO-2988_Self serve_2026_YouTube0135 SASPO-2988_Self serve_2026_YouTube
- 0121 Ministry of Energy and Resources April 20260121 Ministry of Energy and Resources April 2026
- 0134 SASPO-2956_ Safety 20260134 SASPO-2956_ Safety 2026
- 0133 LC Trucking hiring Class 1A Payden0133 LC Trucking hiring Class 1A Payden
- 0132 UMWA 20260132 UMWA 2026
- 0129 Turnbull drivers operators0129 Turnbull drivers operators
- 0128 OSY Rentals updated0128 OSY Rentals updated
- 0126 Steel_Reef_Promo_0126 Steel_Reef_Promo_
- 0118 IBEW 30 sec0118 IBEW 30 sec
- 0114 Prospera Bold Vision0114 Prospera Bold Vision
- 0113 Miller Epic Cinematic Hollywood trailer0113 Miller Epic Cinematic Hollywood trailer
- 0102 Lori Carr Coal Extended0102 Lori Carr Coal Extended
- 0099 Mryglod Steel 1080p0099 Mryglod Steel 1080p
- 0095 Fast Trucking nearly 70 years good at it0095 Fast Trucking nearly 70 years good at it
- 0046 City of Estevan This is Estevan Teaser0046 City of Estevan This is Estevan Teaser
- 0077 Caprice Resources Stand Up For Free Speech0077 Caprice Resources Stand Up For Free Speech
- 0061 SIMSA 2024 For Sask Buy Sask0061 SIMSA 2024 For Sask Buy Sask
- 0051 JML Hiring Pumpjack assembly0051 JML Hiring Pumpjack assembly
- 0049 Scotsburn Dental soft guitar0049 Scotsburn Dental soft guitar
- 0032 IWS Summer hiring rock trailer music
- 0022 Grimes winter hiring
- 0018 IWS Hiring Royal Summer
- 0013 Panther Drilling PO ad 03 top drive rigs
- 0002 gilliss casing services0002 gilliss casing services
- 9002 Pipeline Online 30 sec EBEX9002 Pipeline Online 30 sec EBEX
- 9001
Similarly, around 10 p.m. the night before, Alberta’s wind fleet had dropped to 122 megawatts, 5.3 per cent capacity. Of course, being night time, solar was producing zero. And at that time, again no power was being contributed from battery storage.

Despite Alberta’s wind power putting out just 1 per cent of its capacity, the 50 megawatts of battery capacity attached to the grid were adding nothing to supplement it at 10:16 a.m. on Wednesday, July 27. Alberta Electric System Operator
Alberta puts out this grid-wide data publicly on a minute-by-minute basis. SaskPower, however, does not release this information. Thus, Alberta’s grid data is the closest analog to what Saskatchewan may be experiencing from time to time. SaskPower is moving to increase its reliance on renewables, particularly wind and solar, but is also building natural gas power generation to back it up. It is also building battery storage, as Alberta has.

Wind turbine at Grenfell. Photo by Brian Zinchuk
Pipeline Online keeps checking on Alberta’s grid from time-to-time to see how effective the green transition to renewables is working out for the neighbour province which is much further down this path than Saskatchewan, having built 20 solar facilities, 26 wind facilities, and three battery facilities. On a frequent basis, either wind or solar have shown next to no power production at times, even when the sun is shining. See the stories listed below.
- 0135 SASPO-2988_Self serve_2026_YouTube0135 SASPO-2988_Self serve_2026_YouTube
- 0121 Ministry of Energy and Resources April 20260121 Ministry of Energy and Resources April 2026
- 0134 SASPO-2956_ Safety 20260134 SASPO-2956_ Safety 2026
- 0133 LC Trucking hiring Class 1A Payden0133 LC Trucking hiring Class 1A Payden
- 0132 UMWA 20260132 UMWA 2026
- 0129 Turnbull drivers operators0129 Turnbull drivers operators
- 0128 OSY Rentals updated0128 OSY Rentals updated
- 0126 Steel_Reef_Promo_0126 Steel_Reef_Promo_
- 0118 IBEW 30 sec0118 IBEW 30 sec
- 0114 Prospera Bold Vision0114 Prospera Bold Vision
- 0113 Miller Epic Cinematic Hollywood trailer0113 Miller Epic Cinematic Hollywood trailer
- 0102 Lori Carr Coal Extended0102 Lori Carr Coal Extended
- 0099 Mryglod Steel 1080p0099 Mryglod Steel 1080p
- 0095 Fast Trucking nearly 70 years good at it0095 Fast Trucking nearly 70 years good at it
- 0046 City of Estevan This is Estevan Teaser0046 City of Estevan This is Estevan Teaser
- 0077 Caprice Resources Stand Up For Free Speech0077 Caprice Resources Stand Up For Free Speech
- 0061 SIMSA 2024 For Sask Buy Sask0061 SIMSA 2024 For Sask Buy Sask
- 0051 JML Hiring Pumpjack assembly0051 JML Hiring Pumpjack assembly
- 0049 Scotsburn Dental soft guitar0049 Scotsburn Dental soft guitar
- 0032 IWS Summer hiring rock trailer music
- 0022 Grimes winter hiring
- 0018 IWS Hiring Royal Summer
- 0013 Panther Drilling PO ad 03 top drive rigs
- 0002 gilliss casing services0002 gilliss casing services
- 9002 Pipeline Online 30 sec EBEX9002 Pipeline Online 30 sec EBEX
- 9001