Laying groundwork for carbon trunk line

From left, Whitecap Resources president and CEO Grant Fagerheim was joined by Energy and Resources Minister Bronwyn Eyre, Minister of Social Services Lori Carr and Minister of Environment Warren Kaeding in announcing Saskatchewan’s movement towards substantially more carbon capture, utilization and storage. A key component would be the federal government allowing for carbon tax input credits. Photo courtesy Darcy Cretin/Whitecap Resources

 

CALGARY – Last fall Whitecap Resources announced an ambitious project in conjunction with Federated Co-operatives Limited (FCL) to take carbon dioxide from FCL’s Regina refinery and Belle Plaine ethanol plants, transport them by pipeline to the Weyburn Unit, and use that CO2 for enhanced oil recovery. But a key factor in that plan was the federal government announcing an “investment tax credit” for CO2 that is captured and sequestered.

The recent federal budget did indeed include such an investment tax credit, or ITC. However, use of CO2 for enhanced oil recovery (EOR) was specifically excluded for carbon capture, utilization and storage (CCUS) ITCs.

As of late February, there were a total of four projects signed onto Whitecap’s carbon dioxide hub. During a Feb. 24 earnings call, Whitecap revealed that two more projects had signed onto their carbon dioxide hub project. One was potash miner K+S, which had signed a memorandum of understanding with Whitecap. At the time, another company had also signed on, but was not being disclosed at that time.

Whitecap president and CEO Grant Fagerheim addressed this in his comment during the company’s April 28 earnings conference call, and in response to questions from Pipeline Online.

In his opening comments, Fagerheim said, “Moving over to the new energy part of our business, we have been asked frequently what the federal CCUS investment tax credit means for Whitecap overall. We feel this is the right direction and the level of refundable tax credits was positive, as a good start towards incentivizing larger scale CCUS in both Alberta and Saskatchewan.

  • 0084 EMP Metals Pipeline Online
    0084 EMP Metals Pipeline Online
  • 0053 Kingston Midstream Westspur Alameda Click
    0053 Kingston Midstream Westspur Alameda Click
  • 0082 CsHM 2024 Pipeline
    0082 CsHM 2024 Pipeline
  • 0077 Caprice Resources Stand Up For Free Speech
    0077 Caprice Resources Stand Up For Free Speech
  • 0076 Latus only
    0076 Latus only
  • 0061 SIMSA 2024 For Sask Buy Sask
    0061 SIMSA 2024 For Sask Buy Sask
  • 0055 Smart Power Be Smart with your Power office
    0055 Smart Power Be Smart with your Power office
  • 0051 JML Hiring Pumpjack assembly
    0051 JML Hiring Pumpjack assembly
  • 0049 Scotsburn Dental soft guitar
    0049 Scotsburn Dental soft guitar
  • 0046 City of Estevan This is Estevan
    0046 City of Estevan This is Estevan
  • 0041 DEEP Since 2018 now we are going to build
    0041 DEEP Since 2018 now we are going to build
  • 0032 IWS Summer hiring rock trailer music
  • 0022 Grimes winter hiring
  • 0021 OSY Rentals S8 Promo
  • 0018 IWS Hiring Royal Summer
  • 0013 Panther Drilling PO ad 03 top drive rigs
  • 0011
  • 0006 JK Junior
  • 0002 gilliss casing services
    0002 gilliss casing services
  • 9002 Pipeline Online 30 sec EBEX
    9002 Pipeline Online 30 sec EBEX
  • 9001

 

“As the operator of the world’s largest anthropogenic carbon sequestration project, we believe that by excluding EOR as an eligible use for ITC, there will be a lost opportunity to accelerate decarbonization into the future. Including EOR increases the number of projects that are economic, as the ITC alone will not be enough for all emitters to invest in carbon capture and it also reduces the burden on taxpayers.

“That said, we are excited to move forward with our Alberta and Saskatchewan hubs, now that we have clarity on one of the federal incentive programs.”

Asked by Pipeline Online if they will see any benefit from this new program, either for Whitecap, FCL, or other partners, Fagerheim said, “Certainly there’s an added benefit with the ITC market, now that it’s clarified. So, the economics now, at least we know from what was brought forward on the ITC market federally, part of our proposed Saskatchewan carbon hub project will now be able to dig in and there’s going to be an advantage to an advantage to Saskatchewanians, as well as Albertans, with this.

“It isn’t going to be the same extent that we believed it could have been, but we’ll work within the guidelines that have been provided to us at this time. So projects will proceed. And there’ll be fewer projects to proceed, I think, as a result, because the economics are marginal. But this is where, now, it’s over to us to work closely with the province of Saskatchewan as well as the province of Alberta on what suite of incentives can be put in place by the provincial governments on top of what the federal government has up to this point in time.

“So there’s clarity, now, on this and that’s the positive component of it.”

“We’ve obviously been hoping for the ability for a quicker decarbonization. That wasn’t the case when they excluded enhanced oil recovery projects in the ITC market, but we now we know we can work with the facts that are up there today,” Fagerheim said.

 

  • 0084 EMP Metals Pipeline Online
    0084 EMP Metals Pipeline Online
  • 0053 Kingston Midstream Westspur Alameda Click
    0053 Kingston Midstream Westspur Alameda Click
  • 0082 CsHM 2024 Pipeline
    0082 CsHM 2024 Pipeline
  • 0077 Caprice Resources Stand Up For Free Speech
    0077 Caprice Resources Stand Up For Free Speech
  • 0076 Latus only
    0076 Latus only
  • 0061 SIMSA 2024 For Sask Buy Sask
    0061 SIMSA 2024 For Sask Buy Sask
  • 0055 Smart Power Be Smart with your Power office
    0055 Smart Power Be Smart with your Power office
  • 0051 JML Hiring Pumpjack assembly
    0051 JML Hiring Pumpjack assembly
  • 0049 Scotsburn Dental soft guitar
    0049 Scotsburn Dental soft guitar
  • 0046 City of Estevan This is Estevan
    0046 City of Estevan This is Estevan
  • 0041 DEEP Since 2018 now we are going to build
    0041 DEEP Since 2018 now we are going to build
  • 0032 IWS Summer hiring rock trailer music
  • 0022 Grimes winter hiring
  • 0021 OSY Rentals S8 Promo
  • 0018 IWS Hiring Royal Summer
  • 0013 Panther Drilling PO ad 03 top drive rigs
  • 0011
  • 0006 JK Junior
  • 0002 gilliss casing services
    0002 gilliss casing services
  • 9002 Pipeline Online 30 sec EBEX
    9002 Pipeline Online 30 sec EBEX
  • 9001

 

Do you want to know what’s really going on in the Saskatchewan energy sector? Do you like the in-depth stories like this, that you won’t find anywhere else? Follow Pipeline Online on LinkedInTwitter or Facebook.

 

Patchwork Podcast: Mike Young co-founder & president Integrated Indigenous Energy Management Inc.

Rex Murphy, Quick Dick McDick and Rafi Tahmazian highlight Saskatchewan Oil and Gas Show

Keystone Royalty Part 5: Dealing with the ESG movement as it tries to choke off investment in oil and gas