Boundary Dam Power Station on April 22, 2026. Photo by Brian Zinchuk

Dear Editor:

Re: IBEW 2067 reaction to NDP power plan: Come down to Estevan and Coronach and tell us about it

I grew up in Estevan, never worked in the coal mines or for SaskPower, but had family and many friends that did and still do. The NDP’s plan is a complete disaster for the most part as it completely ignores the jobs that would be lost in the industry based on complete lack of foresight.

I live in Alberta now, suffered through the four year NDP disaster here, and hope Saskatchewan doesn’t make the same mistake Alberta did when they accelerated the coal power phase out here. That saw thousands of job losses, communities destroyed, a government that cost the taxpayers close to $2 billion in PPA contract buyouts, increased costs, and grid instability from rapid renewable energy buildouts that ignored new transmissions infrastructure requirements.

Natural gas generation would work in the southwest part of Saskatchewan due to its natural gas resources, but this would only be as a supplemental backup and would require substantial investment to create the supply as the majority of natural gas production and pipeline distribution systems that was present, has been suspended and abandoned. The NDP’s plan also ignores the infrastructure requirements for natural gas generation, everything from pipelines to compressor stations, not to mention the cost of converting the existing coal plants all adds up to at least a decade or more for each coal fired plant, and in some cases, new builds.

The SMR technology is still developing, so at best, its still a decade out before full commercialization and at least two decades before it would be a major supplier due to a limited trained and skilled operations workforce, which also applies to natural gas plants as well.

The vast coal deposits make it a great source of cheap energy, and combined with new emissions technology that is in place, as well as ongoing research, development and engineering, this has substantially reduced the emissions over the past decade alone. Carbon capture technology is also changing and finding more economic opportunities that just sequestration and EOR.

 

Trent Wallace

  • 0122 SASPO-2956_Safety_2026_Youtube
    0122 SASPO-2956_Safety_2026_Youtube
  • 0109 SaskPower SASPO_2817_PLT_Recruitment_
    0109 SaskPower SASPO_2817_PLT_Recruitment_
  • 0120 2026 SK oil show attendee
    0120 2026 SK oil show attendee
  • 0118 IBEW 30 sec
    0118 IBEW 30 sec
  • 0115 SaskPower SASPO_2817_PLT_Recruitment_DIVERSITY
    0115 SaskPower SASPO_2817_PLT_Recruitment_DIVERSITY
  • 0114 Prospera Bold Vision
    0114 Prospera Bold Vision
  • 0113 Miller Epic Cinematic Hollywood trailer
    0113 Miller Epic Cinematic Hollywood trailer
  • 0085 Turnbull snow removal call office
    0085 Turnbull snow removal call office
  • 0102 Lori Carr Coal Extended
    0102 Lori Carr Coal Extended
  • 0100 Turnbull Project Manager
    0100 Turnbull Project Manager
  • 0099 Mryglod Steel 1080p
    0099 Mryglod Steel 1080p
  • 0097 Eagle Sky Ventures LTD
    0097 Eagle Sky Ventures LTD
  • 0095 Fast Trucking nearly 70 years good at it
    0095 Fast Trucking nearly 70 years good at it
  • 0092 Turnbull projects big and small
    0092 Turnbull projects big and small
  • 0046 City of Estevan This is Estevan Teaser
    0046 City of Estevan This is Estevan Teaser
  • 0077 Caprice Resources Stand Up For Free Speech
    0077 Caprice Resources Stand Up For Free Speech
  • 0061 SIMSA 2024 For Sask Buy Sask
    0061 SIMSA 2024 For Sask Buy Sask
  • 0051 JML Hiring Pumpjack assembly
    0051 JML Hiring Pumpjack assembly
  • 0049 Scotsburn Dental soft guitar
    0049 Scotsburn Dental soft guitar
  • 0041 DEEP Since 2018 now we are going to build
    0041 DEEP Since 2018 now we are going to build
  • 0032 IWS Summer hiring rock trailer music
  • 0022 Grimes winter hiring
  • 0021 OSY Rentals S8 Promo
  • 0018 IWS Hiring Royal Summer
  • 0013 Panther Drilling PO ad 03 top drive rigs
  • 0002 gilliss casing services
    0002 gilliss casing services
  • 9002 Pipeline Online 30 sec EBEX
    9002 Pipeline Online 30 sec EBEX
  • 9001

IBEW 2067 reaction to NDP power plan: Come down to Estevan and Coronach and tell us about it

Boundary Dam Unit 4 fired up on April 22, and it’s more significant than you might think

NDP take Grid and Growth Plan on the road, keep saying they’ll use LNG