Saskatoon-based electrical engineer Brahm Neufeld keeps a sharp eye on all the publicly released data on the province’s electrical grid, as published by SaskPower. While that data is orders of magnitude less detailed than the Alberta Electric System Operator’s public data for that province’s grid, Neufeld is able to pull out remarkable amounts information from what is available here.

He posts his regular analysis, which updates itself automatically, on http://www.skelectricity.info/. And on Jan. 2, he posted his monster infographic. It’s so large, Pipeline Online had to screenshot it on a 4K monitor just to get it in, and even then had to paste two pieces together.

The original can be found here.

So prepare to nerd out – pinch zoom, squint, do what you need, but dig in and discover your own insights.

http://www.skelectricity.info/

Some of Neufeld’s insights, as posted on LinkedIn:

– All the coal Saskatchewan burned could fill a 45,500-car train that would span 1.5 Saskatoon-to-Regina round trips! 🏭
– Just six SMRs (assume BWRX-300) could offset ALL fossil fuel use on our day of LOWEST fossil (coal & gas) generation, and offset 7.6 MT of CO2eq annually – over half of our 2023 footprint. 🟢
– Our best wind streak (back-to-back days of top quartile performance) was 12 days, and our worst calm streak (bottom quartile performance) was 8 days. Sask wind capacity factor at 38% is legitimately one of the best in the world – but the fact wind flatlines periodically flatline is a challenge! 🪁
– Hydroelectric generation consistently trended downwards through 2023, with Q4 2023 about 50% lower than in Q4 2022 on average. 🌊

What will 2024 bring for our electrical grid? New gas offsetting coal? Regina 20 MW battery completed? More wind and solar shaving some fossil peaks? Progress on the SMR file towards deep decarbonization?

You can follow Neufeld’s posts on X at @SKElectricity.

  • 0084 EMP Metals Pipeline Online
    0084 EMP Metals Pipeline Online
  • 0053 Kingston Midstream Westspur Alameda Click
    0053 Kingston Midstream Westspur Alameda Click
  • 0082 CsHM 2024 Pipeline
    0082 CsHM 2024 Pipeline
  • 0077 Caprice Resources Stand Up For Free Speech
    0077 Caprice Resources Stand Up For Free Speech
  • 0076 Latus only
    0076 Latus only
  • 0061 SIMSA 2024 For Sask Buy Sask
    0061 SIMSA 2024 For Sask Buy Sask
  • 0055 Smart Power Be Smart with your Power office
    0055 Smart Power Be Smart with your Power office
  • 0051 JML Hiring Pumpjack assembly
    0051 JML Hiring Pumpjack assembly
  • 0049 Scotsburn Dental soft guitar
    0049 Scotsburn Dental soft guitar
  • 0046 City of Estevan This is Estevan
    0046 City of Estevan This is Estevan
  • 0041 DEEP Since 2018 now we are going to build
    0041 DEEP Since 2018 now we are going to build
  • 0032 IWS Summer hiring rock trailer music
  • 0022 Grimes winter hiring
  • 0021 OSY Rentals S8 Promo
  • 0018 IWS Hiring Royal Summer
  • 0013 Panther Drilling PO ad 03 top drive rigs
  • 0011
  • 0006 JK Junior
  • 0002 gilliss casing services
    0002 gilliss casing services
  • 9002 Pipeline Online 30 sec EBEX
    9002 Pipeline Online 30 sec EBEX
  • 9001

 

Just eight rigs drilling in Saskatchewan on Jan. 2