Strengthening Saskatchewan’s Grid: Harrison releases plan for electrical transmission upgrades
Back in October, the provincial government announced its plan to continue to use coal-fired power generation as it builds its way to nuclear generation. But creating electrons is just part of the problem. The next part is getting those electrons to the end user – though the electrical transmission system and distribution, commonly referred to as the “grid.”
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed