ESTEVAN – SaskPower held a two day open-house regarding at proposed 100 megawatt solar facility on Oct-26-27 at the Estevan Legion Hall.
In actuality, it’s not just a single project of 100 megawatts, but two projects – a 100 megawatt solar facility and a secondary, up to 10 megawatt pilot project.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed