Cost of Coastal GasLink pipeline leaps 70% to $11.2B as TC Energy settles dispute

The projected cost of the contentious Coastal GasLink pipeline spanning northern British Columbia has jumped 70 per cent to $11.2 billion in the wake of a freshly inked deal between operator TC Energy Corp. and the group building a liquified natural gas terminal on the West Coast.